Located on the Denton campus, this educational office renovation was completed by our team in early 2020 for the faculty of the Anthropology Department. 
The project scope included - abatement, demolition, and painting/construction, new millwork, plumbing, lights, signage and HVAC throughout the entire suite. Additionally we were responsible for coordinating the moving of the department between buildings. Space planning and design were achieved through a limited budget and timeframe in order to meet the demands of the department as it provided for students on a continuous basis. 
My tasks included but were not limited to: design assistance, field verification, coordination and communication with the contractors, AutoCAD drawings and details, construction documents, work orders, invoice processing, balancing the budget, documentation and project close out. The project team consisted of Asia Short; Project Manager, Simone Chambers; Design Specialist and myself; Design Assistant.

Before - Training Room Entrance

After - Training Room Entrance

Before - Lobby Entrance

After - Lobby Entrance

Before- Kitchenette

After - Kitchenette

Back to Top